Stage 2: BUILDING

Once the system’s design is completed, the manufacturing phase can start.

 

Prototypes of the vehicle’s powertrain are tested first and a mock-up of the vehicle is realised. Some latest modification will be allowed before manufacturing the two fleets of five vehicles. The homologation process identified during the design phase will be implemented to obtain the necessary permits for using the vehicle on public roads.

 

With regard to the infrastructure, the work on existing buildings has to be anticipated so that hydrogen production and storage equipment can be integrated on time to the sites. The photovoltaic generator installation is scheduled so that the connection to the grid and to the electrolyser can be done at the beginning of 2013. The facilities will be commissioned after certification by the relevant control organisations.

NEWS BOX

The 6th MobyPost Newsletter is available
MobyPost's 6th Newletter edition is now released. This last newsletter includes interesting information about MobyPost testing phase, the new UTBM campus and other news from the hydrogen field.

more news...

COUNTER FOR RENEWABLE
HYDROGEN PRODUCTION
kg
17

(last update: November 18, 2015)
Vehicle
  • Definition of system requirements
  • Simulation and modelling studies of powertrain
  • Style and ergonomic studies
  • Mechanical Engineering

Infrastructure
  • Definition of system requirements
  • Dimensioning of equipment
  • Safety and regulation analysis
  • Design of monitoring system
Vehicle
  • Final design and test of powertrain
  • Construction of vehicles
  • Homologation

Infrastructure
  • Photovoltaic generator installation
  • Modification work on existing buildings
  • Installation of electrolyser, H2 storage,
    H2 refuelling station
  • Certification
  • Training for postmen
  • Field tests
  • Data analysis
  • Dissemination
     & knowledge transfer