Stage 3: TESTING

As soon as the project teams know when the equipment will be operational, training phase of postal workers will be organised. This includes driving and refuelling instructions as well as driving sessions. The link to eco-driving activity of La Poste will be advantageously emphasized.

 

Then, thanks to the monitoring devices embedded in the vehicle and included to hydrogen production and storage infrastructure, the project’s teams will be able to collect and analyse the data of the whole equipment when operating. This will allow the dissemination of project’s results, as well as the knowledge and best practices transfer to external interested groups.

NEWS BOX

The 6th MobyPost Newsletter is available
MobyPost's 6th Newletter edition is now released. This last newsletter includes interesting information about MobyPost testing phase, the new UTBM campus and other news from the hydrogen field.

more news...

COUNTER FOR RENEWABLE
HYDROGEN PRODUCTION
kg
17

(last update: November 18, 2015)
Vehicle
  • Definition of system requirements
  • Simulation and modelling studies of powertrain
  • Style and ergonomic studies
  • Mechanical Engineering

Infrastructure
  • Definition of system requirements
  • Dimensioning of equipment
  • Safety and regulation analysis
  • Design of monitoring system
Vehicle
  • Final design and test of powertrain
  • Construction of vehicles
  • Homologation

Infrastructure
  • Photovoltaic generator installation
  • Modification work on existing buildings
  • Installation of electrolyser, H2 storage,
    H2 refuelling station
  • Certification
  • Training for postmen
  • Field tests
  • Data analysis
  • Dissemination
     & knowledge transfer